REFERENCE # : 2403053

8m x 14m x 5.2m Straw Bale Shed With Mezzanine Floor and a PA Door

BUY A SHED COURSE:

The ShedBlog has launched a course on the Teachable platform that will help shed buyers avoid making costly mistakes when buying a shed. Enroll here.

REFERENCE # : 2403053

Details of this Shed

Building Class – 10 A non-habitable building or structure. (Refer NCC A6G11)
Weight – Approximately: 3,900 kg
Span – Main Building: 8 metres
Length – 14 metres (4 Bays of 3.5 metres each)
Height – 5.2 metres
Roof Type – Gable, 10 degree pitch
Roof – COLORBOND® steel CORODEK® 0.42 BMT (0.47TCT) sheeting, BlueScope
Walls & Trims – COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Gutters – COLORBOND® GUTTER-01. We have calculated the number of [Supplied by Others] downpipes required for: Left Side = 3. Right Side = 3.
PA Doors – One (1) single skin Deluxe COLORBOND® steel door with keyed lockset and lever handle to one side;
Window Openings – Materials to frame up for window opening(s) including a header flashing to suit Four (4) 2100h x3000w glass sliding doors (supply of the window is NOT included).
Dividing Walls – One (1) structural wall coloured red running across the span of the building between bays 3 & 4. COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting. This wall will be the colour selected for internal walls. This wall is structural – they must be installed in the location shown. They cannot be moved at any time.
Open Bays – Two (2) 3.5m open bays – along the sides of the steel building. Refer to Layout (attached) for location & height clearances.
Open Gable-Ends – Steel building has sheeting as shown whilst the right-end-wall-mullions have been removed. Refer to the Layout attached.
Bracing – The building will have Knee and Apex braces. Clearances are subject to the engineer’s final design requirements. Estimated internal knee clearances are: Main Building 3.992m. Estimated internal apex clearance is: 5.384m.
Mezzanine – One (1) bay, starting at bay One (1). Height under joist to be 2.6m, with a clearance under the bearer of 2.4m. Steel bearers and joists only. Bearers supported by One (1) mid columns. Stairs, balustrading and timber flooring supplied by others. Allowable floor load is 3.0kPa uniformly distributed. (Suitable for an office for general use or General storage up to 1.2m high – No concentrated loads).
Roof Purlins & Wall Girts – Z sections bolted to rafters & columns with a minimum overlap of 10% of the bay width.
Fixing to Concrete – Screw-Bolts fitted after concrete is cured.

Site Design Specifications

Site – Eastenrn NSW 2422 Australia
NCC Version – NCC 2022
Design Wind Criteria for the Highest Cardinal Direction – Importance Level 2 with a Vr of 45 m/s; Region A2; TC = 2.5; Mt = 1; Mc = 1; Ms = 1.0; giving a Vdes of 39.4 m/s.
Earthquake – An Earthquake Acceleration Co-efficient (Z) of up to 0.08 has been allowed for in the design of the building, however wind is the determining design factor.
Other Design Factors – No Snow Loading allowed.

Pricing at Mar 2024

Kit Price – $24,345.45
GST – $2,434.55
Delivery – FREE*
Pay-on-Time discount – ($2,010.00)#
TOTAL (inc GST) – $24,770.00
* subject to standard delivery area
#Pay-on-Time discount is applied so long as the final payment is received 10 working days prior to the advised delivery date.

REFERENCE # : 2403053

Specific Inclusions

  • Determination of the design criteria by the engineer. This includes assessment in 8 cardinal directions to determine the site design wind speed based on the building orientation.
  • A comprehensive step by step Construction Kit. This kit is specific to your building and gives step by step, simple to follow instructions on how to build your building.
  • Engineering certification of the steel building to the appropriate Australian Standards.
  • Slab or Pier designs for soil classes A, S, M, H1 and H2.
  • Materials, as nominated above, supplied as per the attached General Specification”.
  • BlueScope – product warranties of up to 15 years apply.

Specific Exclusions

  • Drawings, other than detailed above.
  • Consent authority including any building, development or construction certificate application(s).
  • Construction of the steel building and any foundations (the building is supplied as a kit).
  • Insurance of the steel building once delivered to site or collected from the depot.