REFERENCE # : 2406134
BUY A SHED COURSE:
The ShedBlog has launched a course on the Teachable platform that will help shed buyers avoid making costly mistakes when buying a shed. Enroll here.
REFERENCE # : 2406134
Details of this Shed
Building Class – 7b A building that is used for storage (warehouse), or display of goods or produce for sale by wholesale. (Refer NCC A6G8)
Weight – Approximately: 4,900 kg
Span – Main Building: 7 m
Length – 13 m (3 Bays: 4.33 m, 4.33 m, 4.34 m)
Height – 6 m
Roof Type – Gable, 10 degrees
Roof – COLORBOND® steel CORODEK® 0.42 BMT (0.47TCT) sheeting, BlueScope
Walls & Trims – COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Gutters – COLORBOND® GUTTER-01. We have calculated the number of [Supplied by Others] downpipes required for: Left Side = 2. Right Side = 2.
Roller Doors – One (1) COLORBOND® steel 2.47m high x 2.6m wide roller door (with 1 motorised unit (GDO-6 V3 (or similar) with 2 remote handpieces), roller door is wind rated). Refer to the General Specification (# Access Doors) in relation to opening sizes. The Roller Door is boxed or steel wrapped for protection during transport.
Window Openings – Materials to frame up for window opening(s) including a header flashing to suit Two (2) 2100h x1800w glass sliding doors and Nine (9) 900h x1200w windows (the supply of windows is NOT included).
Solar Panels – Your building has been designed to allow for the loads of a future installation of Solar Panels (by others). The information you have provided is that you require the maximum number of panels on your building. We calculate that you can fit 24 panels on your new steel building. This is typically 8.5kW of Solar Panels. You can of course also put panels on your home or other suitably designed structures to get the maximum benefit from your investment. We have engineered the building for panels to be placed on both sides of the main building.
Bracing – The building will have Knee and Apex braces. Clearances are subject to the engineer’s final design requirements. Estimated internal knee clearances are: Main Building 5.067m. Estimated internal apex clearance is: 6.122m.
Mezzanine – Three (3) bays, starting at bay One (1). Height under joist to be 3m, with a clearance under the bearer of 2.75m. Steel bearers and joists only. Bearers supported by One (1) to Two (2) mid columns. Stairs, balustrading and timber flooring supplied by others. Allowable floor load is 1.5kPa uniformly distributed. 150kg/m2 uniformly distributed.
Roof Purlins & Wall Girts – Z sections bolted to rafters & columns with a minimum overlap of 10% of the bay width.
Fixing to Concrete – Cast-in Brackets.
Site Design Specifications
Site – Southern VIC 3770 Australia
NCC Version – NCC 2022
Design Wind Criteria for the Highest Cardinal Direction – Importance Level 2 with a Vr of 45 m/s ; Region A5; TC = 2.5; Mt = 1; Mc = 1; Ms = 1.0; giving a Vdes of 39.7 m/s.
Earthquake – An Earthquake Acceleration Co-efficient (Z) of up to 0.08 has been allowed for in the design of the building, however wind is the determining design factor.
Other Design Factors – No Snow Loading allowed.
Pricing at June 2024
Kit Price – $30,827.27
GST – $3,082.73
Delivery – FREE*
Pay-on-Time discount – ($2,550.00)#
TOTAL (inc GST) – $31,360.00
* subject to standard delivery area
#Pay-on-Time discount is applied so long as the final payment is received 10 working days prior to the advised delivery date.
REFERENCE # : 2406134
Specific Inclusions
- Determination of the design criteria by the engineer. This includes assessment in 8 cardinal directions to determine the site design wind speed based on the building orientation.
- A comprehensive step by step Construction Kit. This kit is specific to your building and gives step by step, simple to follow instructions on how to build your building.
- Engineering certification of the steel building to the appropriate Australian Standards.
- Slab or Pier designs for soil classes A, S, M, H1 and H2.
- Materials, as nominated above, supplied as per the attached General Specification”.
- BlueScope – product warranties of up to 15 years apply.
Specific Exclusions
- Drawings, other than detailed above.
- Consent authority including any building, development or construction certificate application(s).
- Construction of the steel building and any foundations (the building is supplied as a kit).
- Insurance of the steel building once delivered to site or collected from the depot.