REFERENCE # : 2309063

8m x 18m x 3.5m Storage Shed With Open Gable End, 4 Roller Doors and 2 PA Doors

BUY A SHED COURSE:

The ShedBlog has launched a course on the Teachable platform that will help shed buyers avoid making costly mistakes when buying a shed. Enroll here.

REFERENCE # : 2309063

Details of this Shed

Building Class – 10 A non-habitable building or structure. (Refer NCC A6G11)
Weight – Approximately: 3,700 kg
Span – Main Building: 8 metres
Length – 18 metres (5 Bays: 4 metres, 4 metres, 4 metres, 4 metres, 2 metres)
Height – 3.5 metres
Roof Type – Gable, 10 degree pitch
Roof – COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Walls & Trims – COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Gutters – GUTTER-115-Unslotted. Nominal downpipe spacing = 4m.
Roller Doors – Four (4) COLORBOND® steel 2.4m high x 2.4m wide roller doors (roller door is wind rated). Refer to the General Specification (# Access Doors) in relation to opening sizes. The Roller Doors are boxed or steel wrapped for protection during transport.
PA Doors – Two (2) 2040h x820w COLORBOND® steel doors. Single skin metal clad door with COLORBOND® steel facings and fold-down vertical sides for strength and appearance. On a welded RHS frame, the door is pre-hung into a powdercoated frame. Supplied with a Knob/Knob entrance set;
Window Openings – Materials to frame up for window opening(s) including a header flashing to suit Two (2) 900h x1200w windows (supply of the window is NOT included).
Dividing Walls – One (1) structural wall coloured red running across the span of the building between portals 4 & 5. COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting. This wall is structural – they must be installed in the location shown. They cannot be moved at any time.
Open Bays – Two (2) 2m open bays – along the sides of the steel building. Refer to Layout (attached) for location & height clearances.
Open Gable-Ends – Steel building has sheeting as shown whilst the right-end-wall-mullions have been removed. Refer to the Layout attached.
Bracing – The building will have Knee and Apex braces. Clearances are subject to the engineer’s final design requirements. Estimated internal knee clearances are: Main Building 2.249m. Estimated internal apex clearance is: 3.709m.
Roof Purlins & Wall Girts – Z sections bolted to rafters & columns with a minimum overlap of 10% of the bay width.
Fixing to Concrete – Screw-Bolts fitted after concrete is cured.

Site Design Specifications

Site – Eastern NSW 2763 Australia
NCC Version – NCC 2022
Design Wind Criteria for the Highest Cardinal Direction – Importance Level 2 with a Vr of 45 m/s; Region A2; TC = 2.5; Mt = 1; Mc = 0; Ms = 1; giving a Vdes of 39.2 m/s.
Other Design Factors – No Snow Loading allowed.

Pricing at Sept 2023

Kit Price – $27,600.00
GST – $2,760.00
Delivery – FREE*
Pay-on-Time discount – ($2,280.00)#
TOTAL (inc GST) – $28,080.00
* subject to standard delivery area
#Pay-on-Time discount is applied so long as the final payment is received 10 working days prior to the advised delivery date.

REFERENCE # : 2309063

Specific Inclusions

  • Determination of the design criteria by the engineer. This includes assessment in 8 cardinal directions to determine the site design wind speed based on the building orientation.
  • A comprehensive step by step Construction Kit. This kit is specific to your building and gives step by step, simple to follow instructions on how to build your building.
  • Engineering certification of the steel building to the appropriate Australian Standards.
  • Slab or Pier designs for soil classes A, S, M, H1 and H2.
  • Materials, as nominated above, supplied as per the attached General Specification”.
  • BlueScope – product warranties of up to 15 years apply.

Specific Exclusions

  • Drawings, other than detailed above.
  • Consent authority including any building, development or construction certificate application(s).
  • Construction of the steel building and any foundations (the building is supplied as a kit).
  • Insurance of the steel building once delivered to site or collected from the depot.