REFERENCE # : 2403215-2

6m x 18m x 3m Skillion Roof Vehicle and Equipment Storage Shed with Roof Upgrade for Solar Panels and 3 Roller Doors

BUY A SHED COURSE:

The ShedBlog has launched a course on the Teachable platform that will help shed buyers avoid making costly mistakes when buying a shed. Enroll here.

REFERENCE # : 2403215-2

Details of this Shed

Building Class – 7b A building that is used for storage (warehouse), or display of goods or produce for sale by wholesale. (Refer NCC A6G8)
Weight – Approximately: 3,500 kg
Span – Main Building: 6 m
Length – 18 m (3 Bays of 6 m each)
Height – 3 m (Low Side), 4.06 m (High Side)
Roof Type – Skillion, 10 degrees
Roof – COLORBOND® steel TRIMCLAD® sheeting, BlueScope
Walls & Trims – COLORBOND® steel TRIMCLAD® sheeting, BlueScope
Gutters – PALEEUCALYPT® GUTTER-05. We have calculated the number of [Supplied by Others] downpipes required for: Left Side = 5.
Roller Doors – Three (3) COLORBOND® steel 2.6m high x 3m wide roller doors (roller door is wind rated). Door height will necessitate a manual system (by owner) to reach the top of the door for opening and closing. Refer to the General Specification (# Access Doors) in relation to opening sizes. The Roller Doors are boxed or steel wrapped for protection during transport.
Dividing Walls – Two (2) structural walls coloured red running across the span of the building between bays 1 & 2 and 2 & 3. COLORBOND® steel TRIMCLAD® sheeting. These walls will be the colour selected for internal walls. These walls are structural – they must be installed in the location shown. They cannot be moved at any time.
Solar Panels – Your building has been designed to allow for the loads of a future installation of Solar Panels (by others). The information you have provided is that you require the maximum number of panels on your building. We calculate that you can fit 51 panels on your new steel building. This is typically 18.1kW of Solar Panels. You can of course also put panels on your home or other suitably designed structures to get the maximum benefit from your investment. We have engineered the building for panels to be placed on the left side of the main building.
Roof Purlins & Wall Girts – Z sections bolted to rafters & columns with a minimum overlap of 10% of the bay width.
Fixing to Concrete – Screw-Bolts fitted after concrete is cured.

Site Design Specifications

Site – South Eastern QLD 4520 Australia
NCC Version – NCC 2022
Design Wind Criteria for the Highest Cardinal Direction – Importance Level 2 with a Vr of 57 m/s ; Region B; TC = 2.5; Mt = 1; Mc = 1; Ms = 0.94; giving a Vdes of 44.3 m/s.
Earthquake – An Earthquake Acceleration Co-efficient (Z) of up to 0.08 has been allowed for in the design of the building, however wind is the determining design factor.
Other Design Factors – No Snow Loading allowed.

Pricing at July 2024

Kit Price – $24,972.73
GST – $2,497.27
Delivery – FREE*
Pay-on-Time discount – ($2,060.00)#
TOTAL (inc GST) – $25,410.00
* subject to standard delivery area
#Pay-on-Time discount is applied so long as the final payment is received 10 working days prior to the advised delivery date.

REFERENCE # : 2403215-2

Specific Inclusions

  • Determination of the design criteria by the engineer. This includes assessment in 8 cardinal directions to determine the site design wind speed based on the building orientation.
  • A comprehensive step by step Construction Kit. This kit is specific to your building and gives step by step, simple to follow instructions on how to build your building.
  • Engineering certification of the steel building to the appropriate Australian Standards.
  • Slab or Pier designs for soil classes A, S, M, H1 and H2.
  • Materials, as nominated above, supplied as per the attached General Specification”.
  • BlueScope – product warranties of up to 15 years apply.

Specific Exclusions

  • Drawings, other than detailed above.
  • Consent authority including any building, development or construction certificate application(s).
  • Construction of the steel building and any foundations (the building is supplied as a kit).
  • Insurance of the steel building once delivered to site or collected from the depot.