REFERENCE # : 2401184-2

10m x 20m x 5m Region B Lifestyle Shed with Mezzanine Floor, 3 Roller Doors and a PA Door

BUY A SHED COURSE:

The ShedBlog has launched a course on the Teachable platform that will help shed buyers avoid making costly mistakes when buying a shed. Enroll here.

REFERENCE # : 2401184-2

Details of this Shed

Building Class – 10a A non-habitable building including a private garage, carport, shed or the like. (Refer NCC A6G11)
Weight – Approximately: 7,200 kg
Span – Main Building: 10 m
Length – 20 m (5 Bays of 4 m each)
Height – 5 m
Roof Type – Gable, 10 degrees
Roof – COLORBOND® steel CORODEK® 0.42 BMT sheeting, BlueScope
Walls & Trims – COLORBOND® steel TRIMCLAD® 0.42 BMT sheeting, BlueScope
Gutters – COLORBOND® GUTTER-05. We have calculated the number of [Supplied by Others] downpipes required for: Left Side = 4. Right Side = 4.
Roller Doors – Three (3) COLORBOND® steel 3.6m high x 3m wide roller doors supplied with a planetary gearing system (roller door is wind rated). An internal chain drive has been added to the door to assist with opening and closing the door at heights. Refer to the General Specification (# Access Doors) in relation to opening sizes. The Roller Doors are boxed or steel wrapped for protection during transport. Refer to the Building information for details on Industrial Door Handing.
PA Doors – One (1) Larnec 2040h x 820w Single skin metal clad pre-hung door with COLORBOND® steel® steel facings and fold-down vertical sides for strength and appearance. Powder coated welded RHS frame. Supplied with a Knob/Lever entrance set. 180 degrees opening and reversible handing;
Bracing – The building will have Knee and Apex braces. Clearances are subject to the engineer’s final design requirements. Estimated internal knee
clearances are: Main Building 3.520m. Estimated internal apex clearance is: 5.256m.
Mezzanine – Two (2) bays, starting at bay One (1). Height under joist to be 2.7m, with a clearance under the bearer of 2.41m. Steel bearers and joists only. Bearers supported by Two (2) mid columns. Stairs, balustrading and timber flooring supplied by others. Allowable floor load is 3.0kPa uniformly distributed. 300kg/m2 uniformly distributed.
Roof Purlins & Wall Girts – Z sections bolted to rafters & columns with a minimum overlap of 10% of the bay width.
Fixing to Concrete – Screw-Bolts fitted after concrete is cured.

Site Design Specifications

Site – South Eastern QLD 4380 Australia
NCC Version – NCC 2022
Design Wind Criteria for the Highest Cardinal Direction – Importance Level 2 with a Vr of 57 m/s ; Region B; TC = 2.5; Mt = 1; Mc = 1; Ms = 1.0; giving a Vdes of 47.3 m/s.
Earthquake – An Earthquake Acceleration Co-efficient (Z) of up to 0.08 has been allowed for in the design of the building, however wind is the determining design factor.
Other Design Factors – No Snow Loading allowed.

Pricing at Nov 2024

Kit Price – $54,000.00
GST – $5,400.00
Delivery – FREE*
Pay-on-Time discount – ($4,460.00)#
TOTAL (inc GST) – $54,940.00
* subject to standard delivery area
#Pay-on-Time discount is applied so long as the final payment is received 10 working days prior to the advised delivery date.

REFERENCE # : 2401184-2

Specific Inclusions

  • Determination of the design criteria by the engineer. This includes assessment in 8 cardinal directions to determine the site design wind speed based on the building orientation.
  • A comprehensive step by step Construction Kit. This kit is specific to your building and gives step by step, simple to follow instructions on how to build your building.
  • Engineering certification of the steel building to the appropriate Australian Standards.
  • Slab or Pier designs for soil classes A, S, M, H1 and H2.
  • Materials, as nominated above, supplied as per the attached General Specification”.
  • BlueScope – product warranties of up to 15 years apply.

Specific Exclusions

  • Drawings, other than detailed above.
  • Consent authority including any building, development or construction certificate application(s).
  • Construction of the steel building and any foundations (the building is supplied as a kit).
  • Insurance of the steel building once delivered to site or collected from the depot.