REFERENCE # : 2206244
BUY A SHED COURSE:
The ShedBlog has launched a course on the Teachable platform that will help shed buyers avoid making costly mistakes when buying a shed. Enroll here.
REFERENCE # : 2206244
Details of this Shed
Weight – Approximately: 4,700 kg
Span – 3.5 metres
Length – 20 metres (5 Bays of 4 metres each)
Height – 3.6 metres
Roof Type – Gable, 22.5 degree pitch
Roof – COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Walls & Trims – COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Gutters – 115 High Front quad gutter – Unslotted . Nominal downpipe spacing = 4m.
Roller Doors – One (1) COLORBOND® steel 3m high x 2.688m wide roller door (roller door is wind rated). Two (2) COLORBOND® steel 2.198m high x 2.5m wide roller doors (roller door is wind rated). Refer to the General Specification (# Access Doors) in relation to opening sizes. The Roller Doors are boxed or steel wrapped for protection during transport.
PA Doors – One (1) 2040h x820w COLORBOND® steel door. Single skin metal clad door with COLORBOND® steel facings and fold-down vertical sides for strength and appearance. On a welded RHS frame, the door is pre-hung into a powdercoated frame. Supplied with a Knob/Knob entrance set;
Dividing Walls – One (1) running across the span of the building. COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting. This wall is structural – it must be installed and cannot be moved at any time.
Open Bays – Ten (10) 4m open bays – along the sides of the steel building. Refer to Layout (attached) for location & height clearances.
Open Gable-Ends – Steel building has sheeting as shown whilst the left-end-wall-mullions have been removed. Refer to the Layout attached.
Bracing – The building will have Knee and Apex braces. Minimum internal knee clearances are: Main Building 2.764m. Minimum internal apex clearance is: 3.832m.
Left & Right Lean-to
Span – 3.5m
Drop – 0.4 metres from eave height
Pitch – 10 degrees
Length – Starting bay 1 for 5 bays
Height of External Lean-to wall – 2.58m
One (1) 4m open bay – along the sides of the leanto(s). One (1) 3.5m open bays on the ends of the leanto(s). Refer to Layout (attached) for location & height clearances.
Mezzanine – One (1) bay, starting at bay Five (5). Height under joist to be 2.6m, with a clearance under the bearer of 2.35m. Steel bearers and joists only.Stairs, balustrading and timber flooring supplied by others. Allowable floor load is 3.0kPa uniformly distributed. (Suitable for a office for general use or General storage up to 1.2m high – No concentrated loads).
Roof Purlins & Wall Girts – Z sections bolted to rafters & columns with a minimum overlap of 10% of the bay width.
Fixing to Concrete – Screw-Bolts fitted after concrete is cured.
Site Design Specifications
Site – Southern VIC 3795 Australia
Building Class – 10
Importance Level – 2 with a Vr of 45 m/s
Design Wind Criteria – Region A1; TC = 2.5; Mt = 1; Ms = 1; giving a Vdes of 39.2 m/s.
Other Design Factors – No Snow Loading allowed. No Earthquake Loading allowed.
PRICING AT JULY 2022
Kit Price – $33,790.91
GST – $3,379.09
Delivery – FREE*
Promotional Discount (EOFY Sale & Price Rise) – ($2,790.00)
TOTAL (inc GST) – $34,380.00
* subject to standard delivery area
REFERENCE # : 2206244
Specific Inclusions
- Determination of the design criteria by the engineer. This includes assessment in 8 cardinal directions to determine the site design wind speed based on the building orientation.
- A comprehensive step by step Construction Kit. This kit is specific to your building and gives step by step, simple to follow instructions on how to build your building.
- Engineering certification of the steel building to the appropriate Australian Standards.
- Slab or Pier designs for soil classes A, S, M, H1 and H2.
- Materials, as nominated above, supplied as per the attached General Specification”.
- BlueScope – product warranties of up to 15 years apply.
Specific Exclusions
- Drawings, other than detailed above.
- Consent authority including any building, development or construction certificate application(s).
- Construction of the steel building and any foundations (the building is supplied as a kit).
- Insurance of the steel building once delivered to site or collected from the depot.