‘A’ Series Roller Door Installation Instructions. Issue Date 19th July 2012.
TAUREAN DOOR SYSTEMS
Download PDF copy of these Instructions here
Wind Locked Doors Instruction Supplement PDF here
Home page for Taurean Roller Doors for Sheds & Homes
1. Check the width of the roller door against the opening to which the door is being fitted. For a standard installation the roller door curtain should be 50mm wider than the opening.
2. Referring to the table in the attached diagram, check the head room, the sideroom and the backroom to ensure there is enough room to fit the roller door.
3. If a roller door Electric Operator is going to be fitted, ensure you have enough sideroom on the operator side and allow the correct space between the wall bracket and the edge of the roller door curtain. Refer to the table in the diagram, if applicable, or the operator manufacturer’s installation instructions for the appropriate dimensions.
Extreme safety risk. Safe practices must be observed when working at heights.
4. Mark out the horizontal position for the brackets on the wall; the flanges normally point towards the roller door. The brackets should be positioned well clear of the curtain edge and also clear of the Guide Tracks and any Track Brackets.
5. Mark the vertical position of the brackets above the opening. Refer to the attached diagram. Level the two brackets at the horizontal door mounting faces using a water level or other suitable device.
6. Attach the brackets to the wall by either screwing or welding (if steel frame work).
7. Supplied with the roller door kits are steel and wood fixing screws only, plus washers. Metal fasteners and screws for brick and masonry fixing are not supplied.
If screw fastened, fasteners must be used for the brackets in the following ways:
• For steel fixing, four or more self-drilling/tapping screws must be used to secure each bracket to the wall.
• For timber fixing, three or more 8mm x 50mm Hex. Head Coach Screws must be used per bracket.
• For brick or concrete fixing, depending on the type and condition of the brick or concrete, use three or more long 8mm dia. bolts (or ‘Allthread’) from the outer surface of the wall, or 10mm (M8 thread) metal expansion fasteners (‘Loxins’ or ‘Dynabolts’) and sufficiently long Hex. Head screws to suit on the inner surface of the wall. The installer must assess what is appropriate in each situation. May refer to www.ramset.com.au for detailed fastener information.
Flat washers must be used under all nuts and all bolt and screw heads. A screw or bolt must be fitted to the very top slot for best bracket attachment. Select other slot positions evenly spaced up the bracket flange as required.
If an Electric Operator is to be used, with the door orientated such that the colour side faces outwards from the opening, with the drive disengaged, mount this assembly loosely onto the axle at the required end now.
8. Lift the roller door onto the brackets and loosely secure the axle to the brackets using the two ‘U’ bolts and saddles.
9. The operator should preferably be clamped independent of the axle to wall bracket clamping. In restricted side room situations, some models are capable of being clamped directly to the wall bracket with their own ‘U’ bolt. If so, reference to the axle clamp ‘U’ bolt at that end refers to the operator ‘U’ bolt.
10. Complete the remote operator installation when required with reference to the particular operator manufacturer’s instructions.
Extreme safety risk. Safe practices must be observed when lifting roller doors as they can weigh up to 200kg. The installer must ensure the roller door is secure and safe at all times. The Wall Brackets are designed to support the door only and using the Wall Brackets to mount door lifting gear is not recommended by Stramit. Any injury or damage arising from this practice will be the installer’s responsibility and is not covered by the door warranty.
11. Centre the roller door within the opening with the same amount of curtain overlap each side. Rocking the roller door on its axle will assist the door to move into position.
12. Position the Electric Operator as required at the same time.
13. Move the door to the rear of the bracket slots and without cutting the centre nylon strap, remove other strapping and packaging material.
14. Turn the axle to allow the door to be relaxed on the axle with the Bottom Rail at the bottom of the curtain (6 o’clock position).
15. Fully tighten the two ‘U’ bolts to clamp the axle to the brackets.
16. Now turn the curtain roll 1 turn towards the wall, as viewed from above, and hold in this position. The door now has 1 turn of spring pre-tension.
17. Without letting go of the curtain, cut the centre strap and remove any associated packaging. Holding the centre of the Bottom Rail, the curtain may now be fully opened and closed to ensure the roller door is rolling up in correct alignment on the roll prior to fitting the Guide Tracks. Take care to avoid the nylon braiding or the door curtain touching the wall.
18. The door should have a small amount of lift when in the open position and so a softwood chock may now be carefully positioned between the Bottom Rail and the curtain roll to prevent the door rolling up.
You can buy Series A or Series AA Taurean Door System Roller Door HERE
19. Cut the bottom off the tracks to suit the particular opening height such that the underside of the top stop is level with the top of the opening. Refer to the diagram. Note that this is the normal set-up and part of the Bottom Rail and the Weather Seal will protrude 20mm into the opening when the door is open.
20. Flare out both the side and rear faces at the track top where the track is notched back and pre-slit to give the angles as shown in the attached drawing. The rear face is bent back about 8mm to avoid the nylon webbing from catching on the sharp edge. Refer also to the note to bend away the track front (wall) face so as to avoid the webbing catching if the door is installed high. After fitting the tracks, if necessary adjust the angles to enable smooth entry of the curtain into the top of the track.
21. Insert the supplied track mounting brackets into the smaller ‘U’ profile of the tracks. Space them out in appropriate positions along the tracks, allowing enough room at the top of the tracks to not interfere with the Wall Brackets.
22. Slide the tracks onto the edge of the roller door ensuring the top stops remain above the Bottom Rail to prevent the door rolling up further. Lower the door to the closed position. Push the track against the wall and adjust sideways so there is a 3 to 6mm gap between the inside of the track and the black plastic button at the end of the Bottom Rail. Using a builders level, ensure the tracks are vertical then fix to the wall by either screwing or welding (if steel frame work) using fasteners as follows:
• For steel fixing, self-drilling/tapping screws and washers.
• For timber fixing, 8mm x 50mm Hex. Head Coach Screws and washers.
• For brick or concrete fixing, 8mm x 50mm Hex. Head Coach Screws, washers and plastic plugs.
Note: Before fully fastening the tracks, operate the door fully to ensure it is not binding in the tracks at any point.
23. With the door in the open position and working at only one end of the door at a time, loosen the ‘U’ bolt and, by using the slots in the wall brackets, move the door in towards the wall until just about touching the track front face but avoiding any binding and re-tighten the ‘U’ bolt.
Ensure both ‘U’ bolts are fully re-tightened.
24. If fitting an Electric Operator, fit the weight bar to the bottom rail now.
25. After operating the door a few times, check the door balance. When correctly balanced, the roller door should have a tendency to lift slightly at the top and bottom positions and be neutral or slightly heavy at mid height.
If necessary, adjust the springs as follows:
With the door in the open position, loosen the ‘U’ bolt at one end of the door first. Then move to the other end and while holding the axle from turning with a pipe wrench, loosen the second ‘U’ bolt. The handle of the wrench will want to lift towards the ceiling. Turn the axle with the wrench in the direction required to adjust the door balance. Raise the wrench to reduce spring tension and make the door ‘heavier’, lower to ‘lighten’ (refer to the diagram).
26. Now fully re-tighten both ‘U’ bolts before operating the door down below half height.
27. To fit the centre lock, remove the protective film from this area, position the lock front facia in the panel holes and hold or tape to the outside of the door. From the back of the door, orientate the lock body so that the words on the circular latch are ‘right-way-up’ and screw to the facia with the 2 screws supplied.
28. With the door in the fully closed position, mark the height positions of the plastic Locking Bar Guide slots and cut a hole in the side face of each track for the locking bars to slide through.
29. With the lock arms fully retracted (Important!), temporarily screw the 2 locking bars to the lock arms, mark the curtain edge position then unscrew them again. Cut each bar to this length and chamfer cut the corners for a lead-in. Then Insert the locking bars through the Locking Bar Guides ensuring that any PVC anti-rattle sleeves supplied are fitted and re-screw them to the lock arms. Check the lock operation.
30. Remove the protective film from the outside face of the curtain.
To maintain the roller door’s finish and smooth operation, adhere to the care instruction label on the rear face of the Bottom Rail.
Any questions?
check out THE comprehensive FAQ page
or contact our customer service team now on 0456 729 904
or email us at admin@shedblog.com.au