REFERENCE # : 2403136

6m x 14m x 2.8m Shed Home With Zincalume Roof, Roof Upgrade for Solar Panels and 3 Roller Doors

BUY A SHED COURSE:

The ShedBlog has launched a course on the Teachable platform that will help shed buyers avoid making costly mistakes when buying a shed. Enroll here.

REFERENCE # : 2403136

Details of this Shed

Building Class – 10 A non-habitable building or structure. (Refer NCC A6G11)
Weight – Approximately: 2,300 kg
Span – Main Building: 6 metres
Length – 14 metres (4 Bays of 3.5 metres each)
Height – 2.8 metres
Roof Type – Gable, 10 degree pitch
Roof – ZINCALUME® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Walls & Trims – ZINCALUME® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Gutters – ZINCALUME® GUTTER-04. We have calculated the number of [Supplied by Others] downpipes required for: Left Side = 2. Right Side = 2.
Roller Doors – Three (3) ZINCALUME® steel 2.38m high x 2.6m wide roller doors (roller door is wind rated). Refer to the General Specification (# Access Doors) in relation to opening sizes. The Roller Doors are boxed or steel wrapped for protection during transport.
PA Doors – One (1) single skin Deluxe ZINCALUME® steel steel door with keyed lockset and lever handle to one side;
Window Openings – Materials to frame up for window opening(s) including a header flashing to suit Two (2) 900h x1200w windows (supply of the window is NOT included).
Solar Panels – Your building has been designed to allow for the loads of a future installation of Solar Panels (by others). The information you have provided is that you require the maximum number of panels on your building. We calculate that you can fit 26 panels on your new steel building. This is typically 9.2kW of Solar Panels. You can of course also put panels on your home or other suitably designed structures to get the maximum benefit from your investment. We have engineered the building for panels to be placed on both sides of the main building.
Bracing – The building will have Knee braces. Clearances are subject to the engineer’s final design requirements. Estimated internal knee clearances are: Main Building 2.242m.
Roof Purlins & Wall Girts – Tophat sections with a minimum overlap of 10% of the bay width.
Fixing to Concrete – Screw-Bolts fitted after concrete is cured

Site Design Specifications

Site – South West WA 6420 Australia
NCC Version – NCC 2019
Design Wind Criteria for the Highest Cardinal Direction – Importance Level 2 with a Vr of 45 m/s; Region A1; TC = 2.5; Mt = 1; Ms = 1.0; giving a Vdes of 39.2 m/s.
Earthquake – An Earthquake Acceleration Co-efficient (Z) of up to 0.08 has been allowed for in the design of the building, however wind is the determining design factor.
Other Design Factors – No Snow Loading allowed.

Pricing at Mar 2024

Kit Price – $17,936.36
GST – $1,793.64
Pay-on-Time discount – ($1,490.00)#
Loading of Truck – Free
TOTAL (inc GST) – $18,240.00
* subject to standard delivery area
#Pay-on-Time discount is applied so long as the final payment is received 10 working days prior to the advised delivery date.

REFERENCE # : 2403136

Specific Inclusions

  • Determination of the design criteria by the engineer. This includes assessment in 8 cardinal directions to determine the site design wind speed based on the building orientation.
  • A comprehensive step by step Construction Kit. This kit is specific to your building and gives step by step, simple to follow instructions on how to build your building.
  • Engineering certification of the steel building to the appropriate Australian Standards.
  • Slab or Pier designs for soil classes A, S, M, H1 and H2.
  • Materials, as nominated above, supplied as per the attached General Specification”.
  • BlueScope – product warranties of up to 15 years apply.

Specific Exclusions

  • Drawings, other than detailed above.
  • Consent authority including any building, development or construction certificate application(s).
  • Construction of the steel building and any foundations (the building is supplied as a kit).
  • Insurance of the steel building once delivered to site or collected from the depot.