Details of this Shed

Building Class – 10 A non-habitable building or structure. (Refer NCC A6G11)
Weight – Approximately: 10,200 kg
Span – Main Building: 12 metres
Length – 20 metres (4 Bays of 5 metres each)
Height – 5 metres
Roof Type – Gable, 10 degree pitch
Roof – COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Walls & Trims – COLORBOND® steel TRIMCLAD® 0.42 BMT (0.47TCT) sheeting, BlueScope
Gutters – COLORBOND® GUTTER-05. We have calculated the number of [Supplied by Others] downpipes required for: Left Side = 6. Right Side = 6.
Roller Doors – Three (3) COLORBOND® steel 4m high x 4m wide roller doors (with 3 motorised unit (Grifco LR Drive (or similar) with battery backup, 2 remote handpieces and a wireless wall control), roller door is wind rated). Refer to the General Specification (# Access Doors) in relation to opening sizes. The Roller Doors are boxed or steel wrapped for protection during transport. Refer to the Building information for details on Industrial Door Handing. 
PA Doors – One (1) single skin Deluxe COLORBOND® steel door with keyed lockset and lever handle to one side;
Window Openings – Materials to frame up for window opening(s) including a header flashing to suit Six (6) 900h x1200w windows and One (1) 2100h x1800w glass sliding door (the supply of windows is NOT included).
Bracing – The building will have Knee and Apex braces. Clearances are subject to the engineer’s final design requirements. Estimated internal knee clearances are: Main Building 3.203m. Estimated internal apex clearance is: 5.231m. Side Walls bracing will be supplied as cable.
Mezzanine – One (1) bay, starting at bay One (1). Height under joist to be 2.6m, with a clearance under the bearer of 2.35m. Steel bearers and joists only. Bearers supported by Two (2) mid-columns. Stairs, balustrading and timber flooring supplied by others. Allowable floor load is 1.5kPa uniformly distributed. (Suitable for General Storage up to 600mm high- No concentrated loads)
Roof Purlins & Wall Girts – Z sections bolted to rafters & columns with a minimum overlap of 10% of the bay width. Brackets are provided so that the Z is bolted through the web.
Fixing to Concrete – Screw-Bolts fitted after concrete is cured

Site Design Specifications

Site – North Coast QLD 4740 Australia
NCC Version – NCC 2022
Design Wind Criteria for the Highest Cardinal Direction – Importance Level 2 with a Vr of 66 m/s; Region C; TC = 2.07; Mt = 1.07; Mc = 1.05; Ms = 1.0; giving a Vdes of 61 m/s.
Earthquake – An Earthquake Acceleration Co-efficient (Z) of up to 0.08 has been allowed for in the design of the building, however wind is the determining design factor.
Other Design Factors – No Snow Loading allowed.

Pricing at Mar 2024

Kit Price – $80,981.82
GST – $8,098.18
Delivery – FREE*
Pay-on-Time discount – ($6,690.00)#
TOTAL (inc GST) – $82,390.00
* subject to standard delivery area
#Pay-on-Time discount is applied so long as the final payment is received 10 working days prior to the advised delivery date.

REFERENCE # : 2403161-2

Specific Inclusions

  • Determination of the design criteria by the engineer. This includes assessment in 8 cardinal directions to determine the site design wind speed based on the building orientation.
  • A comprehensive step by step Construction Kit. This kit is specific to your building and gives step by step, simple to follow instructions on how to build your building.
  • Engineering certification of the steel building to the appropriate Australian Standards.
  • Slab or Pier designs for soil classes A, S, M, H1 and H2.
  • Materials, as nominated above, supplied as per the attached General Specification”.
  • BlueScope – product warranties of up to 15 years apply.

Specific Exclusions

  • Drawings, other than detailed above.
  • Consent authority including any building, development or construction certificate application(s).
  • Construction of the steel building and any foundations (the building is supplied as a kit).